Plug-in solar
Plug-In Solar in California: What SB 868 Allows From 2027
California's SB 868 makes plug-in solar up to 1,200 W legal from January 1, 2027, without utility approval or fees. The rules, the 2030 sunset and the costs.
Key facts
- California's SB 868 was approved by the governor on September 30, 2026 as Chapter 985, Statutes of 2026, and takes effect on January 1, 2027.
- A qualifying device has a maximum aggregated AC output of 1,200 W per dwelling and plugs into a receptacle.
- It must be certified as a plug-in photovoltaic system by UL or an equivalent laboratory and meet the NEC and the California Electrical Code.
- Utilities may not require approval, fees or extra equipment, but may ask for a simple online registration; the exemption expires on January 1, 2030 unless extended.
- California's average residential rate was 29.75 cents per kWh in August 2026, the highest of the states we cover, according to the EIA.
Plug-in solar, also called balcony solar, becomes legal in California on January 1, 2027. Senate Bill 868, signed on September 30, 2026, exempts a device of up to 1,200 W of AC output per dwelling from all interconnection requirements if it is certified as a plug-in photovoltaic system. Utilities may ask for an online registration, not approval or fees. The exemption expires in 2030 unless extended.
Is plug-in solar allowed in California today?
Not yet under SB 868. The bill was chaptered on September 30, 2026 as Chapter 985 of the Statutes of 2026 and carries no urgency clause, so it takes effect on January 1, 2027, the normal date for California laws. Until then, a solar device that feeds your home’s wiring is a generator under your utility’s interconnection rules: Rule 21 for PG&E, Southern California Edison and San Diego Gas & Electric, and each municipal utility’s own rules for LADWP, SMUD and the others. Those rules require an application before any generator operates in parallel with the grid.
Plugging in a kit before January without an application can breach your service agreement. Enforcement against a small device is rare, but the cleaner path is to wait two months.
State Senator Scott Wiener carried the bill, also known as the Plug and Play Solar Act. By the Bright Saver tracker’s count, California was the tenth state with a signed plug-in solar law. For the others, see plug-in solar laws by state.
What SB 868 allows
SB 868 adds a short chapter on portable solar generation devices to the Public Utilities Code. The definition of a portable solar generation device is the strictest of the state laws we have read: it requires certification of the complete plug-in system, not only of its parts.
| Rule | What SB 868 says |
|---|---|
| Effective date | January 1, 2027 |
| Maximum output | 1,200 W maximum aggregated AC output per dwelling |
| Connection | Connected to and disconnected from the building’s wiring through a receptacle |
| Purpose | Intended to offset the customer’s onsite consumption |
| Codes | Meets the most recent National Electrical Code and the California Electrical Code (Title 24, Part 3) |
| Certification | Certified as a plug-in photovoltaic system by UL or an equivalent nationally recognized testing laboratory |
| Outage behavior | A certified feature isolates the device so it cannot backfeed the grid in an outage |
| Utilities covered | Investor-owned electrical corporations and local publicly owned utilities |
| Approval, fees, equipment | None may be required |
| Registration | A utility may require a simple online form: address, make, model and size |
| Sunset | The interconnection exemption is repealed on January 1, 2030 |
“Aggregated” matters: the 1,200 W cap counts every plug-in device in the dwelling together. Two 800 W kits in one apartment would exceed it. Our guide to the 1,200 W limit explains how output and panel wattage relate.
The 2030 sunset and the sales rule
The section that exempts devices from interconnection and forbids approval requirements and fees stays in effect only until January 1, 2030. Utilities negotiated that sunset, according to trade press coverage. Unless the Legislature extends it, devices installed under the exemption would face whatever rules apply after that date.
A separate sales rule points the other way. From January 1, 2030, a portable photovoltaic device designed to plug into a receptacle may not be sold or offered for sale in California unless it meets the code, certification and isolation requirements of the definition. The cheap, unlisted kits sold online today would then be off the market in California regardless of what happens to the exemption.
Certification: why California is stricter
Utah’s law requires a listed device; Virginia’s requires certification by a recognized laboratory. California’s requires certification “as a plug-in photovoltaic system.” In practice, that points to a complete-system listing under UL 3700, the outline of investigation for interactive plug-in photovoltaic equipment and systems, for which UL Solutions opened a certification program in January 2026. The isolation feature that prevents backfeeding during an outage must itself be certified.
A microinverter listed to UL 1741, sold with panels and a cord that are not listed as a system, does not meet that wording as we read it. The first microinverters certified to UL 3700 appeared in mid-2026; how many complete kits carry a system listing by January 2027 is something to check product by product. Ask for the certificate and the laboratory’s file number. Our inverter guide explains the difference between the listings.
Registration with your utility
The law lets a utility require notification through a simple online registration form with your address and the device’s make, model and size. It forbids turning that into an approval. As of November 2026 we have not seen registration forms from PG&E, SCE or SDG&E; utilities that choose to require one would need it by January, so check your utility’s website then. Our guide on telling your utility about plug-in solar explains what to keep on file.
Because the device is exempt from interconnection, it does not enroll in California’s net billing tariff. Exported electricity earns nothing.
Renters, condos and HOAs
SB 868 deals with utilities and product safety. Neither the Assembly committee analysis nor published summaries of the final bill mention landlords, condominium associations or homeowners associations. California’s Solar Rights Act, in Civil Code section 714, limits restrictions on solar energy systems, but whether it covers a portable device hung on a balcony railing has not been tested as far as we know. For renters, the lease decides. Our guides on plug-in solar for renters and HOA rules cover how to ask.
What plug-in solar can save in California
California’s average residential rate was 29.75 cents per kWh in August 2026, according to the EIA, against 18.16 cents nationally. That is why the state matters so much for plug-in solar. Production estimates come from the PVWatts model (National Laboratory of the Rockies, formerly NREL) for Los Angeles, panels facing due south; Sacramento comes out within a few percent. They assume you use every kilowatt-hour yourself.
| Kit size (panels) | Tilted 30°, kWh/year | Vertical railing, kWh/year | Value at 29.75 ¢/kWh |
|---|---|---|---|
| 400 W | about 680 | about 400 | $120 to $205 |
| 800 W | about 1,360 | about 790 | $235 to $405 |
| 1,200 W | about 2,050 | about 1,190 | $355 to $610 |
Two caveats. First, the average rate hides time-of-use pricing: on many California plans, midday electricity is cheaper than the evening peak, so a kilowatt-hour from a balcony kit at noon may be worth less than the average. Second, surplus earns nothing, so a kit sized beyond your daytime load wastes part of its output. A kit with a small battery shifts some of it into the evening. Our cost and savings guide shows the arithmetic.
How to get ready for January 2027
- Wait until January 1, 2027 before plugging in, unless your utility has approved the device under its existing rules.
- Choose a kit certified as a complete plug-in photovoltaic system by UL or an equivalent laboratory, with a total output of no more than 1,200 W for the whole dwelling.
- Get written permission from your landlord, or check your HOA or condo rules.
- Complete your utility’s online registration if it publishes one.
- Mount the panels securely; see our mounting bracket guide.
- Plug into one outlet, with no extension cord or power strip, and keep the certificate with your records.
Common mistakes
- Buying now, plugging in now. The exemption does not apply before January 1, 2027.
- Counting kits separately. The 1,200 W cap is aggregated per dwelling.
- Accepting an inverter listing as system certification. California’s wording asks for more.
- Assuming the exemption is permanent. It sunsets in 2030 unless the Legislature acts.
Next steps
Frequently asked questions
Is plug-in solar legal in California?
From January 1, 2027, yes. SB 868 exempts certified plug-in devices of up to 1,200 W per dwelling from all interconnection requirements. Until then, a plug-in kit is subject to your utility's interconnection rules, such as Rule 21 for PG&E, SCE and SDG&E.
Do I need PG&E's permission for a balcony solar kit?
Not from January 1, 2027. SB 868 bars electrical corporations and local publicly owned utilities from requiring approval, fees or extra equipment for a qualifying device. A utility may require a simple online registration with your address and the device's make, model and size.
What does the 2030 sunset in SB 868 mean?
The section that exempts plug-in devices from interconnection rules is repealed on January 1, 2030 unless the Legislature extends it. From the same date, a receptacle-connected solar device that lacks the required code compliance and certifications may not be sold in California.
Does SB 868 cover LADWP and SMUD customers?
Yes. The law applies to local publicly owned electric utilities as well as investor-owned utilities, so municipal utilities such as LADWP and SMUD may not require approval or fees for a qualifying device either.
Can I get net billing credit for a plug-in solar kit in California?
SB 868 exempts the device from interconnection, which is the gateway to California's net billing tariff, so a plug-in kit earns no export credit. It saves money through the electricity you use yourself while it produces.
Can my landlord or HOA stop me from installing plug-in solar in California?
SB 868 does not address landlords or associations, as far as the committee analysis and published summaries show. California's Solar Rights Act limits restrictions on solar energy systems, but whether it reaches a portable plug-in device has not been tested as far as we know. Get permission in writing.
Sources
- SB-868 Electricity: portable solar generation devices, chaptered text (Chapter 985, Statutes of 2026)
- SB-868 bill history
- Assembly Committee on Utilities and Energy: analysis of SB 868 (hearing June 10, 2026)
- CA SB 868 (2025-2026): bill status, chaptered as Chapter 985, Statutes of 2026
- Civil Code § 714 (Solar Rights Act)
- California Public Utilities Commission: Rule 21 interconnection
- Newsom signs California plug-in solar bill, establishing the nation's largest balcony solar market
- Plug-in solar legislation tracker
- UL Solutions debuts testing and certification framework for safer plug-in solar across the United States
- Electric Power Monthly, Table 5.6.A: average price of electricity to ultimate customers by state
- PVWatts Calculator
This guide is general information, not legal, tax or electrical advice. Your utility, state and local code have the final say.