Plug-In Solar and Your Utility: When You Must Tell Them

Do you need to tell your utility about plug-in solar? Maryland and Virginia require notice before you plug in, Maine above 420 W; other states differ.

By Voltgeber Editorial Team Updated Last verified 7 min read Applies to United States

This guide is still being verified. Some details may change.

Plug-In Solar and Your Utility: When You Must Tell Them

Key facts

  • In the states with plug-in solar laws, the utility may not require approval, an interconnection agreement or a fee for a compliant device.
  • Maryland requires notice to the electric company before installation, with a certification of the device's safety features and maximum capacity.
  • Virginia requires a notice on a State Corporation Commission form before installation from January 1, 2027; the utility has 15 days to flag deficiencies.
  • Maine requires notice within 30 days only above 420 W of combined inverter output per service address.
  • Without a state plug-in law, a grid-tied kit is a customer generator under the utility's interconnection rules, which usually means an application.

Whether you must tell your utility about plug-in solar depends on your state. Maryland requires notice before you install a kit, Virginia will from January 1, 2027, and Maine requires it within 30 days above 420 W. None of them lets the utility demand approval or a fee for a compliant device. Without a state plug-in law, the utility’s interconnection rules apply, which usually means an application.

Notice is not permission

The plug-in solar laws drew a clear line. Before them, any generator that ran in parallel with the grid, however small, needed the utility’s consent through an interconnection agreement: an application, a review, often a permit, sometimes a fee. The laws remove that consent for a small certified device. What some of them keep is a duty to inform.

The difference matters. A notice is a form you send; the utility files it. An application is a request the utility can refuse, delay or attach conditions to. Maine’s statute states it directly: a utility may not deny the installation of a compliant system. Virginia’s goes further and treats you as compliant if the utility does not flag a problem with your form within 15 days.

Our overview of plug-in solar laws by state covers which states have such laws. This page covers what each one asks of you toward the utility.

State by state: who has to notify, and when

The table covers the states whose utility provisions we have read in the statute or on the regulator’s site. Bright Saver’s tracker listed ten signed laws by November 2026; for the others, check the law or your utility before you plug in.

State Notice required When Other conditions
Utah (HB 340, since May 2025) none found in the published summaries not applicable no approval, fee or extra equipment may be required
Maine (LD 1730, since July 2026) only above 420 W combined within 30 days after installation PUC form; licensed electrician and dedicated circuit above 420 W
Maryland (HB 1532, 2026) yes before installation one system per meter; certification of safety features and capacity; customer pays for a locking disconnect if one is required
Virginia (from Jan. 1, 2027) yes before installation SCC form online or by mail; 15-day utility response window; utility may add a locking disconnect where there is more than one device
California (SB 868, from Jan. 1, 2027) reported that the utility may ask for notice to be set out by utilities no interconnection agreement or approval; sunset in 2030
States without a plug-in law interconnection application before operation utility tariff and local permit rules

California’s details come from press coverage of the signed bill rather than the enrolled text, so treat that row as reported. The same goes for Colorado, where Bright Saver says notice may be required after installation; we have not confirmed the provision in the act. Our state pages for Utah and Maine go into the details.

12470
A notice tells the utility a small generator sits behind your meter; it does not ask permission.

What the notice usually contains

The forms published so far ask for a handful of facts. Have them ready before you start:

  • your name, service address and utility account number,
  • the device’s maximum AC output in watts, from the inverter’s label or data sheet,
  • the certification of the device by a recognized testing laboratory, ideally with the standard and certificate number,
  • a statement that the installation complies with the state law, and in Maine above 420 W, that a licensed electrician installed it on a dedicated circuit,
  • for Maryland, a description of the device’s safety features, such as the automatic shutdown during an outage.

Maine’s form goes to Central Maine Power or Versant Power, not to the Public Utilities Commission. Maryland’s PSC lists notification contacts and forms for each electric company and cooperative. Virginia’s form will be set by the State Corporation Commission.

How to notify your utility

  1. Read your state’s rule. Check whether notice is required, whether it comes before or after installation, and whether your device’s size triggers extra steps, such as Maine’s 420 W threshold.

  2. Collect the device documents. Data sheet, certificate from the testing laboratory and the inverter’s rated output. Keep the electrician’s invoice if one was required.

  3. Fill in the official form. Use the form from the regulator or the utility’s own plug-in solar page, not a seller’s template.

  4. Send it the way the rule says. Email or mail as the form specifies. Keep the sent email or a mailing receipt.

  5. Wait if the law gives the utility time. In Virginia, the utility has 15 days to point out deficiencies; after that you may install.

  6. File the paperwork with your lease and insurance papers. It answers later questions from a landlord, an HOA or an insurer.

What the utility may and may not do after your notice

The plug-in laws are consistent about the utility’s limits. Utah, Maine and Virginia bar the utility from requiring approval before installation, from charging a fee for the device and from demanding controls or equipment beyond what is built into it; Maryland’s PSC describes the same ban on prior approval and fees. Maine adds that the utility may not require an interconnection application, agreement or study.

There are two narrow exceptions. In Maryland, if a device requires an automatic locking disconnect switch, the customer pays for its installation. In Virginia, the utility or cooperative may install an automatic locking disconnect where a property has more than one device or the distribution circuit requires it. In return for these limits, the laws relieve the utility of liability for damage or injury the device causes, which is one more reason to tell your insurer.

Should you notify when the law does not require it?

In Utah, and in Maine below 420 W, no notice is required. Sending a short note anyway costs nothing and has three advantages: the utility knows why its meter records small exports, a line crew working on your street knows a generator sits behind your meter, and you have a dated record if a question comes up later.

The case against is mostly practical. Some utility staff do not yet know the plug-in laws and may respond as if you had applied for a rooftop system. If that happens, cite the statute and ask for a written answer. A compliant device needs no permission in these states, and a notice does not create a duty to seek one.

In states without a plug-in law

Most states have no plug-in category. There, a kit that feeds power into your wiring while connected to the grid is a customer-owned generator, and the utility’s interconnection tariff applies. Florida is a typical example: its rule for investor-owned utilities puts every system up to 10 kW into Tier 1, with a standard agreement, no application fee and no insurance requirement, but an inspection under local code before the system runs. Our Florida guide walks through it.

Calling the utility before you buy is the honest route. Some utilities will tell you a small kit needs the full process; some have no answer yet. Plugging in without saying anything is common and rarely detected, but it can breach your service agreement, and it is the kind of detail an insurer asks about after a fire. A portable power station charged by its own panels is the alternative that needs no notice anywhere, because it never connects to the grid.

Meters, exports and your bill

Telling the utility also helps you understand your bill. A plug-in kit sends any surplus back through your meter, and meters handle that differently:

  • Smart and digital meters usually record imported and exported electricity separately. Your bill shows only imports; exports are lost unless you have a net metering agreement.
  • Some meters may record reverse flow as consumption. The Maryland PSC warns that, depending on the meter type, exported power may be counted as zero or added to consumption.
  • Old electromechanical meters, now rare, can run backwards, which credits you unofficially. Utilities do not want that, and it is one reason some ask to be told.

Net metering is off the table under the plug-in laws: Utah, Maine and Virginia exclude plug-in devices from it explicitly. If exports matter to you, size the kit to your daytime use. Our guide to plug-in solar for home explains how to match kit size to base load.

Next steps

Frequently asked questions

Do I need to tell my utility about a plug-in solar kit?

It depends on your state. Maryland and, from January 2027, Virginia require notice before installation; Maine requires it within 30 days above 420 W. In states without a plug-in law, the utility's interconnection rules apply, and they generally require an application for any generator connected to the grid.

Can my utility refuse my plug-in solar kit?

In a state with a plug-in law, not if the device complies: the laws bar utilities from requiring approval, interconnection agreements, fees or extra equipment. Maine's statute says outright that a utility may not deny a compliant system. In other states the utility decides through its interconnection process.

What information does the utility notification ask for?

Typically your service address and account, the inverter's maximum output, the device's certification and a statement that it complies with the law. Maine's form asks for the service address, inverter capacity and a compliance statement; Maryland asks for a certification of safety features and maximum capacity.

Will my meter run backwards with plug-in solar?

Many US homes now have digital or smart meters, which register exported electricity separately or ignore it rather than running backwards. The Maryland PSC warns that, depending on the meter, exported power may be recorded as zero or even added to consumption. Ask your utility how your meter handles reverse flow.

Does my utility pay me for electricity my kit exports?

Not under the plug-in laws. Utah, Maine and Virginia exclude plug-in devices from net metering, and the others work the same way as far as we have found. To get credit for exports you would need a regular interconnection and net metering agreement.

What happens if I plug in a kit without telling the utility?

Where notice is required by law, you are out of compliance and lose the law's protection. Where no plug-in law exists, an undisclosed parallel generator can breach your service agreement. Enforcement against small kits is rare, but it can matter after a fire or an insurance claim.

Sources

  1. Balcony Solar Maryland Public Service Commission, accessed Nov 3, 2026
  2. Va. Code § 56-596.8: Small portable solar generation devices; exempt from interconnection Virginia General Assembly, accessed Nov 3, 2026
  3. 35-A MRSA § 3475: Plug-in photovoltaic and plug-in battery systems Maine Legislature, accessed Nov 3, 2026
  4. Plug-In Solar Form Maine Public Utilities Commission, accessed Nov 3, 2026
  5. Utah Code § 54-15-601: Portable solar generation device, exemptions, requirements Utah State Legislature, accessed Nov 3, 2026
  6. Fla. Admin. Code R. 25-6.065: Interconnection and Metering of Customer-Owned Renewable Generation Legal Information Institute, Cornell Law School, accessed Nov 3, 2026
  7. Newsom signs California plug-in solar bill establishing the nation's largest balcony solar market pv magazine USA, accessed Nov 3, 2026
  8. Plug-in solar legislation tracker Bright Saver, accessed Nov 3, 2026

This guide is general information, not legal, tax or electrical advice. Your utility, state and local code have the final say.